The 2dF/AAOmega software system is controlled through a number of user
interface tasks (seen in Figure
). The 2dF/AAOmega
control computer is actually aatlxy and is located in the
electronics rack behind the blue screens and above the CCD VME systems.
For technical reasons, the control tasks appear on the dual headed
console of aatlxb.
The control tasks are as follows:
- The 2dF Control Task (tdfct) -- This task is responsible
for loading and initialising all the others (see Figure
). It contains status windows for all the
subsystems it controls as follows:
- Telescope
- Positioner
- ADC (Atmospheric Dispersion Compensator)
- AAOmega Spectrograph
- CCDs control
Each of these sections contains basic information on the status of the
subsystem and a More button. Clicking on this button will bring
up a control window which provides more detailed control of the
specific subsystem.
- FPI Control Task (fpictrl) -- This task provides control
of the focal plane imaging camera, and its gantry (see Figure
). It is possible to use this task to drive the
FPI to almost any star in a configuration file. It is used for
field acquisition and for the astrometric calibration process. The
images from the FPI camera are displayed by the IMG task which has its
own window. Due to a lack of readily available image display software
at the time of the initial construction of the 2dF system, this custom
written display task requires an 8-bit display and so currently
operates within an 8-bit VNC session running on the console.
- The Positioner User Interface (POS) -- In recent times the
POS task has been largely superseded by the use of the
tdfeng engineering interface (see Figure
). Under normal operation the
main purpose of the POS task is/was to provide a mimic
display of the 2dF positioner. It also includes the ability to control
most of the positioner functions. In normal operation, however, the
positioner should be controlled through the control task's positioner
control window, whenever possible, rather than through the POS task.
Figure:
The console of
aatlxb showing the 2dF/AAOmega control system in operation
 |
Next: The Control Task
Up: The 2dF/AAOmega Software System
Previous: Starting Up the 2dF
  Contents
Rob Sharp
2006-10-30