v1.1

UK  Schmidt Telescope  Schedule
Semester 2002B (1 Aug 2002 - 31 Jan 2003) - Version 1.1
5 July 2002
 
Date Proposal/Proposers Instrument + Gratings UKST Observer
Th Aug 1 G    6dF/104   PARKER  (0.5)       +  6dFGS  (0.5)         6dF + 1200R, 600V, 316R         CPC
Fr   2 G          "               "                                 "           "           "         "         "            "
Sa   3 D          "               "                                 "           "           "         "         "            "
Su   4 D          "               "                                 "           "           "         "         "            "
Mo Aug 5 D     6dF/133  VAUGHAN  (0.5)   +  6dFGS  (0.5)           6dF + 1200V, 316R, 600V          MH
Tu   6 D     6dFGS          6dF + 316R, 600V            "
We   7 D         "              "         "         "            "
Th   8 D         "              "         "         "            "
Fr   9 D         "              "         "         "            "
Sa   10 D         "              "         "         "            "
Su   11 D         "              "         "         "         KSR
Mo Aug 12 D     6dFGS           6dF + 316R, 600V         KSR
Tu   13 G         "             "         "         "             "
We    14 G         "              "         "         "            " 
Th   15 G         "              "         "         "            "
Fr   16 B         "             "         "         "            "
Sa   17 B     6dF/112   BESSELL           6dF + 1200B         DMJ
Su   18 B         "                 "             "          "            "
Mo Aug 19 B         "                 "                 "          "               "  
Tu   20 B     Unscheduled              
We   21 B         "         
Th   22 B         "        
Fr   23 B         "         
Sa   24 B         "         
Su   25 B     6dF/112   BESSELL                           6dF + 1200B         DMJ
Mo Aug 26 B     6dF/112   BESSELL          6dF + 1200B        DMJ
Tu   27 B         "                 "            "          "            "
We   28 B     6dFGS           6dF + 316R, 600V                  MH
Th   29 G         "             "         "         "                       "
Fr   30 G         "             "         "         "                      "
Sa   31 G         "             "         "         "                       "
Su Sep 1 D     6dF/82   CROOM           6dF + 250B                     "      
Mo Sep 2 D     6dF/82   CROOM           6dF + 250B                           MH
Tu   3 D         "               "             "         "                    KSR
We   4 D         "               "                   "         "                      "
Th   5 D         "               "                    "         "                       "
Fr   6 D     6dF/134   COLLESS            6dF + 1200V           "
Sa   7 D         "             "          "           "
Su   8 D         "            "          "           "
Mo Sep 9 D     6dFGS          6dF + 316R, 600V                    CPC
Tu   10 D         "             "         "         "                        "
We   11 G         "             "         "         "                         "
Th   12 G         "             "         "         "                          "
Fr   13 G         "             "         "         "                           "
Sa   14 B         "             "         "         "                          "
Su   15 B     6dF/112   BESSELL            6dF + 1200B         DMJ
Mo Sep 16 B     ENGINEERING - 6dF spectrograph upgrade         New VPH gratings       
Tu   17 B                   "                   "             "                "                     
We   18 B                   "                   "             "                "      
Th   19 B                   "                   "             "                "        
Fr   20 B                   "                   "             "                "         
Sa   21 B     Unscheduled
Su   22 B         "
Mo Sep 23 B         "
Tu   24 B     6dF/112   BESSELL          6dF + 1200B        DMJ
We   25 B         "                 "             "          "           "
Th   26 B         "                 "            "          "           "
Fr   27 G     6dFGS          6dF + VPH        FGW
Sa   28 G         "            "          "            "
Su   29 G         "            "          "            "
Mo Sep 30 D     6dFGS          6dF + VPH        FGW
Tu Oct 1 D         "            "          "            "
We   2 D         "             "          "            "
Th   3 D         "                  "          "                CPC
Fr   4 D         "                    "         "            "
Sa   5 D         "                           "         "           "
Su   6 D         "                          "         "           "
Mo Oct 7 D     6dFGS             6dF + VPH                 CPC
Tu   8 D         "            "          "                   "
We   9 D         "            "          "          MH
Th   10 G         "            "          "            "
Fr   11 G         "            "          "            "
Sa   12 G         "            "          "            "
Su   13 B         "            "          "            "
Mo Oct 14 B     6dFGS          6dF + VPH         MH
Tu   15 B     6dF/112   BESSELL          6dF + 1200B        DMJ
We   16 B           "                "             "          "            "
Th   17 B           "                "             "          "            "
Fr   18 B     Unscheduled
Sa   19 B         " 
Su   20 B         "
Mo Oct 21 B     Unscheduled
Tu   22 B         "
We   23 B         "
Th   24 B     6dF/112   BESSELL         6dF + 1200B        DMJ
Fr   25 B           "                "             "          "            "
Sa   26 B           "                "             "          "            "
Su   27 G     6dFGS          6dF + VPH         CPC
Mo Oct 28 G     6dF/112   BESSELL          6dF + 1200B         CPC
Tu   29 G           "                "             "          "            "
We   30 D     6dF/109   ROSE          6dF + 1200B           "
Th   31 D           "             "             "          "            "
Fr Nov 1 D           "             "             "          "          CPC
Sa   2 D           "             "            "          "          MH
Su   3 D     6dFGS          6dF + VPH           "
Mo Nov 4 D     6dFGS          6dF + VPH         MH
Tu   5 D         "             "          "            "
We   6 D         "            "          "            "
Th   7 D     6dF/112   BESSELL          6dF + 1200B            "
Fr   8 G           "                "             "          "          KSR
Sa   9 G           "                "             "          "            "
Su   10 G           "                "             "          "            "
Mo Nov 11 B     6dFGS          6dF + VPH         KSR
Tu   12 B         "            "          "           "
We   13 B         "            "          "            "
Th   14 B     6dF/112   BESSELL          6dF + 1200B        DMJ
Fr   15 B         "                  "             "          "            "
Sa   16 B         "                  "             "          "            "
Su   17 B     Unscheduled
Mo Nov 18 B     Unscheduled
Tu   19 B         "
We   20 B         "
Th   21 B         "
Fr   22 B         "
Sa   23 B     6dF/112   BESSELL          6dF + 1200B        DMJ
Su   24 B           "                "             "          "            "
Mo Nov 25 G     6dF/112   BESSELL          6dF + 1200B        DMJ
Tu   26     6dFGS          6dF + VPH         MH
We   27 G         "             "          "            "
Th   28 G         "            "          "            "
Fr   29 D         "            "          "            "
Sa   30 D         "            "          "            "
Su Dec 1 D     6dFGS          6dF + VPH           "
Mo Dec 2 D     6dFGS          6dF + VPH         KSR
Tu   3 D         "            "          "            "
We   4 D         "            "          "            "
Th   5 D         "            "          "            "
Fr   6 D         "            "          "            "
Sa   7 D         "            "          "            "
Su   8 G         "            "          "          CPC
Mo Dec 9 G     6dFGS          6dF + VPH         CPC 
Tu   10 G         "            "          "            "
We   11 B         "            "          "            "
Th   12 B         "            "          "            "
Fr   13 B         "            "          "            "
Sa   14 B     6dF/112   BESSELL          6dF + 1200B        DMJ
Su   15 B           "                "             "          "            "
Mo Dec 16 B     6dF/112   BESSELL          6dF + 1200B        DMJ
Tu   17 B     Unscheduled
We   18 B         "
Th   19 B         "
Fr   20 B         "
Sa   21 B         "
Su   22 B         "
Mo Dec 23 B         " 
Tu   24 B         "
We   25 B         "
Th   26 G     6dFGS          6dF + VPH         KSR
Fr   27 G         "            "          "            "
Sa   28 G         "            "          "            "
Su   29 G         "            "          "            "
Mo Dec 30 D     6dFGS           6dF + VPH         KSR 
Tu   31 D         "            "          "            "
We Jan 1 D         "            "          "          CPC
Th   2 D         "            "          "            "
Fr   3 D         "            "          "            "
Sa   4 D         "            "          "            "
Su   5 D         "            "          "            "
Mo Jan 6 D     6dFGS          6dF + VPH        CPC
Tu   7 G         "            "          "          MH
We   8 G         "            "          "            "
Th   9 G         "            "          "            "
Fr   10 G         "            "          "            "
Sa   11 G         "            "          "            "
Su   12 B         "            "          "            "
Mo Jan 13 B     6dF/112   BESSELL          6dF + 1200B        DMJ
Tu   14 B           "                "             "          "            "
We   15 B           "                "             "          "            "
Th   16 B     Unscheduled
Fr   17 B         "
Sa   18 B         "
Su   19 B         "
Mo Jan 20 B     Unscheduled
Tu   21 B     6dF/112   BESSELL          6dF + 1200B        DMJ
We   22 B           "                "             "          "            "
Th   23 B           "                "             "          "            "
Fr   24 B     6dFGS          6dF + VPH         CPC
Sa   25 G         "            "          "            "
Su   26 G         "            "          "            "
Mo Jan 27 G     6dFGS          6dF + VPH         CPC
Tu   28 G         "            "          "            " 
We   29 D         "            "          "            "
Th   30 D         "            "          "          MH
Fr   31 D         "            "          "            "
Footnotes
6dF/112 This program is externally funded until the end of September 2002.  Observing beyond that date in bright time is contingent upon further funding.
6dFGS   = 6dF Galaxy Survey
UKST Observers CPC = Paul Cass; MH = Malc Hartley; DMJ = Dionne James; KSR = Ken Russell;  FGW = Fred Watson
Photography High-priority photographic programs (shown below) will over-ride 6dF programs in suitable weather conditions (photometric sky with excellent seeing). The I Survey and H-alpha Survey will be completed to 'A' grade on a best-efforts basis (replacing existing poor 'B' grades). Lower priority photographic programs have the status of engineering back-up programs (to be attempted in the case of 6dF engineering down-time). 
Photographic over-ride Programs
I  Survey  Field 1 H-alpha  Survey (Magellanic Clouds) Field  MC5
Non-survey T/1169 (Drinkwater); T/1170 (Guibert); T/1187 (Drew)

Schedule Notes

General Notes