The Coude Echelle Spectrographs (Expert Information)


Appendix C1: General Setup

Next: Installing the detector | Contents | Home


A typical sequence of operations at the beginning of an observing run is:

1. Configure telescope optics

2. Ensure that the spectrograph hardware is ready:

UCLES UHRF

3. Start the SYNTEL micro-computer



Ray Stathakis (ras@aaoepp.aao.gov.au)
Last Update: 22 March 2000