Checklist for PN.S at TNG
(revised Dec 2, 2001)
| ITEM | SUMMARY | NOTES AND REFERENCE TO MESSAGES (DATE) |
|---|---|---|
| flange | Quote from RSAA on file, funding available | URGENT |
| lamps | Need to check on what's available | URGENT |
| control | require serial connection from Nasmyth to Control room, 19" rack at Nasmyth with 230V | |
| storage | in WHT dome area until further notice; dry nitrogen fill required | |
| transportation | facilities required for transportation to TNG | |
| CCDs | 2 x required, preferably 13.5 micron or smaller |